Bassi Bogetaorio

Climate Resilience project

Solarization of Getunu Borehole
Project Overview
Project Name: |
Drilling, Casing, Test pumping, Equipping |
Start Date: |
2nd MAY 2024 |
Estimated Completion Date: |
30th June 2024 |
Status: |
Completed |
Sector: |
Climate Change, Water |
Location: |
Bassi Bogetaorio, Bobasi Sub-County |
GPS Location of the Investment |
Latitude: S 0o 53’54’’
|
Introduction
Residents of Getunu Location In Bassi Bogetaorio Ward, Bobasi Sub -County were thrilled by the availability of water close to their homes and a nearby learning institution. The solar-powered project will supply clean and safe drinking water not only to the students but also to the nearby homesteads.
Economic Benefit
With a reliable supply of clean water now readily available residents no longer need to spend hours fetching water from distance sources. This time-saving conveniences allows individuals to engage more in productive activities, such as farming and running small businesses.
reliable water access will also encourage school attendance and performance by keeping children hydrated and healthy. it free up time previously spent fetching water.
Citizen Benefit
The project is a major milestone for the local community, offering numerous benefits that directly enhance the lives of the residents. One of the significant advantage is the easy access to clean and safe drinking water, which is now available right near their homes.
For the learners the borehole ensures they have a consistent supply of clean water, which is essential for maintaining good health and hygiene. This not only supports their overall well-being but also contributes to better academic performance, as students can focus more on their studies without the worry of water scarcity or related health issues.