Bassi Bogetaorio

rigena borehole.com
Climate Resilience project
Solarization of Getunu Borehole

Project Overview

Project Name:

Drilling, Casing, Test pumping, Equipping

Start Date:

2nd MAY 2024

Estimated Completion Date:

30th June 2024

Status:

Completed

Sector:

Climate Change, Water

Location:

Bassi Bogetaorio, Bobasi Sub-County

GPS Location of the Investment 

Latitude: S 053’54’’
Longitude: E 3450’29’’
Altitude 1985.74m
Accuracy: 4.98m

Introduction

Residents of Getunu Location In Bassi Bogetaorio Ward, Bobasi Sub -County were thrilled by the availability of water  close to their homes and a nearby learning institution. The solar-powered project will supply clean and safe drinking water not only to the students but also to the nearby homesteads.

Economic Benefit

With a reliable supply of clean water now readily available residents no longer need to spend hours fetching water from distance sources. This time-saving conveniences allows individuals to engage more in productive activities, such as farming and running small businesses.

reliable water access will also encourage school attendance and performance by keeping children hydrated and healthy. it free up time previously spent fetching water. 

Citizen Benefit

The project is a major milestone for the local community, offering numerous benefits that directly enhance the lives of the residents. One of the significant advantage is the easy access to clean and safe drinking water, which is now available right near their homes.

For the learners the borehole ensures they have a consistent supply of clean water, which is essential for maintaining good health and hygiene. This not only supports their overall well-being but also contributes to better academic performance, as students can focus more on their studies without the worry of water scarcity or related health issues.